New Workspace Units and Refurbishment Works at Hayle Marine Renewables Business Park, North Quay, Ha...
Main contract details
<p style="margin: 0px;"><span style="margin: 0px; font-family: 'Arial',sans-serif;"> </span></p>
<p style="margin: 0px;"><span style="margin: 0px; font-family: 'Arial',sans-serif;">The project is part-funded by the European Regional Development Fund (ERDF) and the contractor will be required to comply with all relevant EU Regulations and specifically the Branding and Publicity Guidelines required of an ERDF funded project. The Ministry of Housing, Communities and Local Government (MHCLG) as Managing Authority for the European Regional Development Fund (ERDF) programme has completed the technical appraisal of the full application and approved in principle the award of ERDF grant. The pre-offer ERDF conditions have been cleared and at the time of writing the Council is awaiting receipt of the funding agreement. Any update to this position will be shared with all tenderers by way of a tender clarification. At present, a steel fence divides the site, and there is a level variation that will need to be overcome by the project. </span></p>
<p style="margin: 0px;"><span style="margin: 0px; font-family: 'Arial',sans-serif;"> </span></p>
<p style="margin: 0px;"><span style="margin: 0px; font-family: 'Arial',sans-serif;">On the land owned by Cornwall Council, the project will deliver 5no. BREEAM Excellent light industrial units (Building 1) with office and workspace at ground floor ,office use mezzanines and solar PVs , totalling circa 1,119m2 GIA, and deliver cross cutting themes. These are both key requirements of the ERDF funding. Each industrial unit will be of a steel frame construction with piled foundations. Works will include foundations, building envelope, internal partitions and fitting out, and MEP. The contractor will need to allow for ground remediation works in the area due to the presence of asbestos and caution will need to be taken due to the proximity of live HV cables. Works to this area of the site will include alterations to boundaries, provision of parking, retaining walls, landscaping and external works, and the provision of infrastructure incl. new supplies / utilities and drainage connections on-site and off-site, BT, and plant rooms as designed to operate the buildings.</span></p>
<p style="margin: 0px;"><span style="margin: 0px; font-family: 'Arial',sans-serif;"> </span></p>
<p style="margin: 0px;"><span style="margin: 0px; font-family: 'Arial',sans-serif;">On the land owned by Western Power, the project will deliver 1no. BREEAM Excellent light industrial unit (Building 2) with office and workspace at ground floor, office use mezzanine and solar PVs , totalling circa 369m2 GIA, and deliver cross cutting themes. These are both key requirements of the ERDF funding. Each industrial unit will be of a steel frame construction with strip and pad foundations. Works will include foundations, building envelope, internal partitions and fitting out, and MEP. Works to demolish and reconstruct an existing retaining wall will also be required in this area. The project will also deliver the extension and refurbishment of an existing switch room (Building 3) to BREEAM Very Good, with a new roof and solar PVs, totalling circa 435m2 combined GIA. The contractor will need to allow for asbestos surveys, removals, and clearance testing as part of the refurbishment works. The contractor will need to allow for ground remediation works as outlined in the strategy provided with the procurement documents, and works will also include the provision of parking, landscaping and external works, and the provision of infrastructure incl. new supplies / utilities and drainage connections on-site and off-site, BT, and plant rooms as designed to operate the buildings.</span></p>
<p style="margin: 0px;"><span style="margin: 0px; font-family: 'Arial',sans-serif;"> </span></p>
<p style="margin: 0px;"><span style="margin: 0px; font-family: 'Arial',sans-serif;">The contractor will be responsible for obtaining each of the BREEAM credits targeted during RIBA Stages 5 and 6 and will also be responsible for discharging each of the outstanding planning conditions listed within the works information. The Council anticipates the Contract Award to take place during May 2021, with completion and occupation of the new facilities during June 2022.</span></p>
Key dates
Expression of interest window
From 14/01/2021 09:00 to 23/03/2021 12:00
New to ProContract?
If you are not currently registered on the ProContract procurement portal, you can complete a simple registration process by clicking the following link - Register free