Proactis
Supplying The South West
  • CP2643-25 Cullompton Town Centre Relief Road

CP2643-25 Cullompton Town Centre Relief Road

Main contract details

Opportunity Id
DN791237
Title
CP2643-25 Cullompton Town Centre Relief Road
Categories
45233120-6 - Road construction works
Description
Tender Process:
The Works will be procured via open tender following the traditional route. The form of Contract will be NEC4 ECC Option A. On the Date of Tender release, the Contracting Authority will provide a detailed design Drawings Pack, corresponding Design Specifications and instructions on the Client's tender evaluation methodology, which will comprise scoring against both Quality and Price. Each tendering party shall be required to provide an Activity Schedule to validate their submission, based on their own take off quantities.
The estimated Contract Start Date of the 22nd May 2026 allows for a 6-week mobilisation period prior to starting on site on 6th July 2026. The Award of Contract is expected to take place on the 22nd April 2026.

Works Overview:
Construction of a new relief road in Cullompton, Devon, linking Station Road and Exeter Road via Meadow Lane. This will provide a bypass of the town centre, approximately 1.3km in length and 6.5m in nominal width, including a 2.0m wide footway to the west side. Summary of works:
- Partial realignment of a 60m section of Meadow Lane to facilitate connection to the new relief road and a change of priority at its junction with Duke Street.
- A new roundabout junction connecting the relief road to Station Road and Millenium Way.
- Construction of 5 new junctions providing access to existing minor roads and adjacent properties.
- Highways drainage provision including 2 surface water attenuation ponds.
- Demolition of existing sporting facilities in proximity the west coast mainline boundary.
- Replacement of a section of existing fencing to the west coast mainline boundary with new palisade fencing.
- Works within the adjacent areas of public open space including construction of new paths, landscaping, and fencing works.
- Coordination of utilities diversionary works required by BT, National Grid, Wales and West Utilities, and SWW to accommodate the Works.
Relief Road Works:
Ch 0-130m - Partial realignment of both Meadow Lane and Duke Street and the reconfiguration of their Junction with a change of priority. Replacement of the existing culvert running under this Junction and the provision of a new 3.0m wide shared use path linking into an off-road shared use public open space (to be constructed by others).
Ch 130-280m - Construction of an offline section of the relief road on embankment in the fields to the south of the existing Duke Street. This section will incorporate 1 road bridge to cross Spratford Mill Stream, 3 large flood relief culverts, and a new side road junction with Duke Street to provide access to the Cullompton Community Association (CCA) fields.
Ch 280-460m - Construction of the relief road on embankment leading northwards from Duke Street to the existing Cricket Ground. This section will incorporate the removal and reconstruction of the Duke Street / Old Hill embankment to provide a new road junction with Old Hill and a pedestrian link to Duke Street, 2 new flood relief culverts, and the construction of a new drainage attenuation basin between the road and existing railway.
Ch 460-590m - Construction of the relief road through the existing cricket field and bowls club. This section will be nominally at grade and will be constructed with an interface to adjacent works by others to construct the new Bowls Club house and green (works are likely to be ongoing at the time of the relief road construction). This road section incorporates the construction of a new access junction to the new Bowls Club and the demolition of the existing Bowls Club house and green in proximity to the railway boundary.
Ch 590-840m - Construction of the relief road adjacent the railway and through the existing Cullompton Rangers Football Club site. This section will be nominally at grade and will be constructed with an interface to adjacent works by others to construct the replacement Football Club facilities including a new adult training pitch and carpark. This road section incorporates the construction of a new access junction to the Football Club and the removal of the existing Football Club sheds and lighting columns in proximity to the railway boundary.
Ch 840-1270m - Construction of the relief road through existing areas of public open and fields through to Station Road. This section will be nominally at grade, and will incorporate 1 flood relief culvert, a new drainage attenuation basin, and a new access junction and side road to provide an alternate access into the park home and Showman's site behind the Weary Traveller Pub.
Ch 1270-1350m - Construction of a new 4 arm roundabout junction connecting the Relief Road to Station Road and Millenium Way. The new roundabout will be constructed at the location of the existing Station Road Millenium Way 3 arm roundabout. The roundabout will have an ICD of 40m and central Island radius of 9.6m.
Highway Boundary Works:
Approx. 450m of timber 4 post and rail fencing with dog proof mesh to areas adjacent public open space.
Approx. 1000m of timber 4 post and rail fencing to other highway boundaries.
Approx. 500m of Devon Bank.
Approx. 150m of palisade fence to the railway boundary.
Approx. 100m of 2.0m high acoustic fencing to the park home site boundary.
6 No. field access gates.
Acoustic Infill fencing to property boundaries along Meadow Lane.
Vehicle Restraint Systems (VRS) Works:
Approx. 20m long section of 1.8m high x 350mm thick brick wall constructed as a masonry parapet to provide N1 containment to provide protection to an existing residential property.
Minimum N1 containment VRS to both sides of the road between chainages 160m and 390m.
Drainage Works:
A new surface water drainage system for the roadway.
Kerb drainage units and a piped carrier drain system throughout the length of the Relief Road.
Replacement of the existing kerb and gully drainage system at the Station Road junction with Millenium Way with a new kerb drainage system tying into the existing carrier drain network.
Modification of the existing kerb and gulley drainage system to Meadow Lane to accommodate its partial realignment.
Construction of 2 new attenuation basins. The first approx. 750m3 in volume, and the second at approx. 450m3 in volume.
Construction of 2 sections of 600mm twin pipe attenuation systems, 22m long and 9m long.
Construction of 3 new outfalls to existing watercourses.
Construction of hydrobrake chambers to attenuation pond and watercourse outlets. Provision of 3?treatment systems to remove hydrocarbons, total suspended solids and metals from runoff.
1 existing culvert extension at 600mm diameter.
Construction of 4 culverts of 450mm or 600mm diameter to proposed ditches.
A 400m long section of new swale / ditch.
Earthworks:
Earthworks operations to facilitate the road construction with an overall fill quantity of approximately 16,000m3.
Bulk earthworks for roadway embankment formed of a class 6C starter layer and class 1A General fill.
Construction of steep 1/1.5 side slopes embankment sections using a core of Class 1A material and Class 6N1 material on the edges.
Pavements:
New full depth bituminous pavement construction to the full extent of the relief road.
Resurfacing with nom. 40mm inlay to Station Road and Millenium Way as part of the construction of the new roundabout.
Resurfacing with nom. 40mm inlay retained sections of Meadow Lane and Duke Street between chainages 20m and 90m.
Kerbs, Footways and Paved Areas:
The Relief Road will be provided with either kerbs or kerb drainage units to both sides of the road over its full length.
A 2.0m wide bituminous surfaced footway is proposed to one side of the relief road from chainage 100m to 1280m transitioning to shared paths at either end.
Approx. 500m length of 3.0m wide shared use path with bituminous surfacing is proposed to be provided within the public open space connecting to the relief road near its northern end and then running north along the relief road through to Station Road.
New traffic signs and road markings will be provided throughout the scheme extents.
The relief road will become the B3181 so will require the provision of new and replacement directional signs to the wider area.
The relief road will also be provided with double yellow lines throughout its length.
A one-way system will be implemented on Duke Street between its junctions with Rivermead and Chestnut Avenue.
Street Lighting:
The provision of civil works and coordination of the electrical works Contractor for the installation of a system of street lighting covering the full extent of the Relief Road. The lighting system comprises 39 new 10m lighting columns.
Structures:
Construction of 1 new road bridge (S04) over Spratford Mill stream on a 20-degree skewed alignment, having a single 15m clear span, 12.3m overall width, PU32 sheet piled abutments, and MY7 precast prestressed deck beams with concrete infill deck.
Flood Relief Culverts (Contractor Design Items):
S02 - New 2 cell box culvert 2000mm wide x 480mm high x 11m long to replace the existing culvert across Meadow Lane at its junction with Duke Street.
S05 - New box culvert 4000mm wide x 1200mm high x 16m long to be constructed within an existing field.
S06 - New 2 cell box culvert 4000mm wide x 1400mm high x 16m long to be constructed within an existing field.
S07 - New box culvert 4000mm wide x 1200mm high x 18m long to be constructed within an existing field.
S08 - New 2 cell box culvert 6000mm wide x 3000mm high x 16m long to be constructed in an existing watercourse.
S09&10 - New 2 cell box culvert 3000mm wide x 1200mm high x 16m long to be constructed in an existing field.
S11 - New box culvert 1500mm wide x 900mm high x 16m long to be constructed within an existing drainage ditch.

There will be a Tender Launch Event on Tuesday 16th December 2025 at 11:00AM. Please use this link to sign up:
https://forms.office.com/pages/responsepage.aspx?id=gzehjWjLP0S7S5l_d_1b-4mLsw8gtztKu6HIP272CL5UQkdIWlIzSVNZVDU3M1hXNFBKWEhMT08zTS4u&route=shorturl

Region(s) of supply
Devon CC
Estimated value
N/A
Keywords
Activity Schedule, Cullompton, Relief Road, Construction Work, Devon

Key dates

Estimated contract dates
Start date
22/05/2026
End date
01/01/2028

Expression of interest window

From 02/12/2025 12:00 to 23/02/2026 12:00

Login and register interest in this opportunity

New to ProContract?
If you are not currently registered on the ProContract procurement portal, you can complete a simple registration process by clicking the following link - Register free

Contact details

Buyer
Devon County Council
Contact
Chloe Staddon
Email
chloe.staddon@devon.gov.uk
Telephone
44 1392 381258
Address
County Hall
Exeter
Devon
EX2 4QD
United Kingdom

Attachments

No attachments

  • Cookie policy
  • Terms and Conditions
  • Privacy
  • Accessibility
  • Help Center

Version

Your session is about to expire in

Please use the button below to continue working

Loading...

At Proactis we value your privacy

We use essential cookies to make our website work. We’d also like to set optional cookies to provide you with the best experience and help us to improve the site.

If you are happy with this, please select "Accept all". Further information on the individual cookies we use, their purposes and to easily manage these, please click "Manage options".

Cookie Policy   |   Privacy policy

Cookie Policy

To make this site work properly, we sometimes place small data files called cookies on your device. Most big websites do this too.

What are cookies?

A cookie is a small text file that a website saves on your computer or mobile device when you visit the site. It enables the website to remember your actions and preferences (such as login, language, font size and other display preferences) over a period of time, so you don't have to keep re-entering them whenever you come back to the site or browse from one page to another.

How do we use cookies?

A number of our pages use cookies, for example to remember:

  • Your display preferences, such as contrast colour settings or font size
  • If you have agreed (or not) to our use of cookies on this site

Enabling these cookies is not strictly necessary for the website to work but it will provide you with a better browsing experience. You can delete or block these cookies, but if you do that, some features of this site may not work as intended.

Please see the table below for more information on what cookies are used on this site and their purpose:

Category of use Description
Session and persistent cookies Similar to most websites, we use 'session cookies'. These cookies only exist for the length of time that you visit our site and are are deleted once you close the browser. We also use 'permanent cookies' known as 'persistent cookies' which remain stored on your browser ready for use the next time you visit our website.
Authentication We use cookies to help us show you the right information and personalise your experience when you’re logged in.
Security We use cookies to enable and support our security features, and to help us detect malicious activity and violations of our Website Terms and Conditions.
Preferences, features and services Cookies can help you fill out forms on our site quicker. They also allow us to recognise if you’ve contacted us before – for example through our Live Chat. You can learn more in our Privacy Policy.
Performance, Analytics and Research Cookies help us learn when you access our site from other websites, applications, or devices such as your work computer or your mobile device.

How to control cookies

You can control and/or delete cookies as you wish - for details, see below. You can delete all cookies that are already on your computer and you can set most browsers to prevent them from being placed. If you do this, however, you may have to manually adjust some preferences every time you visit a site and some services and functionalities may not work.
AllAboutCookies.org

At Proactis we value your privacy

We use essential cookies to make our website work. We’d also like to set optional cookies to provide you with the best experience and help us to improve the site.

Details of the essential and non-essential cookies we use are provided. You can confirm your consent preference for non-essential cookies using the toggles within the table.

Essential cookies


Name Type Description Expiry
.ASPXAUTH Session Cookie These cookies are used when authenticating your access to ProContract. End of Session
__RequestVerificationToken Session Cookie This cookie is used to prevent Cross Site Request Forgery (CSRF) attacks. This is a is a type of malicious exploit of a website where unauthorised commands are transmitted from a user that the web application trusts. End of Session
ASP.NET_SessionId Session Cookie This cookie is used to identify your user session. This cookie allows our web servers to respond to your actions on the website such as "Expressing interest in opportunities" or browsing the website. The website wouldn't work for you without it End of Session
ContractRegister_Org_PortalId Session Cookie These cookies are used to store and recall information when searching/using the ProContract Contracts Register. End of Session
ContractRegister_Portal_PortalId Session Cookie These cookies are used to store and recall information when searching/using the ProContract Contracts Register. End of Session
Opportunity_Org_PortalId Session Cookie These cookies are used to store and recall information when searching/using the ProContract advertised opportunity portal. End of Session
Opportunity_Portal_PortalId Session Cookie These cookies are used to store and recall information when searching/using the ProContract advertised opportunity portal. End of Session

Non-Essential Cookies


Name Description On/Off
Application Insights

This is a service provided by Microsoft which collects data to allow us to monitor the health and status of the web application.

GoogleAnalytics

These cookies are used to track and store anonymised user usage. Please click here for further information.;