West of Cheltenham Transport Improvement Scheme (WCTIS) – UK Cyber Business Park; Phases 3 and 4, We...
Main contract details
The WCTIS schemes will contribute to accelerating the release of the employment land associated with the West Cheltenham Strategic Allocation and Cyber Central. The schemes will deliver transport benefits to people living and working in Gloucestershire by improving traffic flows on the A40, one of the most important and busiest sections of Gloucestershire’s road network. The walking and cycling (WCWCI) aspect of the scheme is tendered together, and is considered to be an accompanying scheme to WCTIS.
This contract will deliver the design and construction of Phases 3 and 4 of WCTIS; Arle Court Roundabout to Gloucester Road Junction including Benhall Roundabout together with WCWCI.
WCTIS Phases 1 & 2 are currently in construction and a more detailed summary of works is included on the website at https://www.gloucestershire.gov.uk/highways/major-projects-list/west-cheltenham-transport-improvement-scheme-uk-cyber-business-park/
WCTIS Phases 3 & 4
Design and Build for;
• A40 (Arle Court to Gloucester Road/Lansdown Road junction) eastbound carriageway improvements (towards Cheltenham town centre);
• Telstar Way widening to Hubble Road;
• Benhall Roundabout remodelling including eastbound widening.
WCWCI – Walking and Cycling Improvement Scheme
Design and Build for Cycle and pedestrian infrastructure improvements including;
• Mix of segregated and shared use cycling and walking routes along the A40 from Arle Court roundabout to TGI Fridays Junction (A40/B4633).
• Secondary routes in the St Mark’s district of West Cheltenham, and
• Princess Elizabeth Way.
A summary of the outline programme for the scheme is shown below:
Tender period :06th July 2020 to 07th August 2020
Anticipated Award: August 2020
Works Start Date: January 2021
Completion: November 2021
Overall Duration: 48 weeks
Indicative Value: £4.5m
The procurement route will be a single stage (open process) using the NEC4 ECC Option C Target Cost form of contract with Activity Schedule.
Full details will be available in the ITT stage. Due to the size of the Drainage CCTV files and the 1GB limit on folders in Procontract they are stored on our Egress Switch file sharing software. Please complete the short registration on Egress if you have not used it previously and request access to the 3 files through the links below:
V6.06 Drainage CCTV part 1 https://reader.egress.com/remote.aspx/2645877b6f9c4967bc740666d1a02e20
V6.06 Drainage CCTV part 2 https://reader.egress.com/remote.aspx/637037680f3a41adb1a49815c4620abf
V6.06 Drainage CCTV part 3 https://reader.egress.com/remote.aspx/2495b4054061451d9b77190e18d2126b
Key dates
Expression of interest window
From 08/06/2020 18:00 to 07/08/2020 12:00
New to ProContract?
If you are not currently registered on the ProContract procurement portal, you can complete a simple registration process by clicking the following link - Register free
Contact details
Gloucester
Gloucestershire
GL1 2TH
United Kingdom