Interpretation Designer - St Mary's Lighthouse and Visitor Centre
Main contract details
Attached is a set of the tender documents which include the following:-
a) Instructions for Tendering
b) Form of Tender
c) Non Collusive Tendering Certificate
d) Specification
e) Method Statement
f) Schedule of Prices
g) General Conditions of Contract
h) Specific Conditions
i) Articles of Agreement
j) Appendices
Can I urge you to pay careful attention to the Instructions for Tendering and other Tender Documents, as the procedure and stipulations laid down therein will be adhered to. Tenderers will be deemed to have read, examined and accepted all of the Tender Documents and the terms and conditions contained prior to submission of the Tender.
The Authority intends to award the contract on the basis of the offer which is the most economically advantageous to the Authority taking into account quality, technical merit and price.
You should note that the Authority is not bound to accept the lowest or any of the Tenders submitted. The documents as requested by the Instructions for Tendering will be a central aspect of the evaluation, and this invitation to tender should not be taken as an acceptance by the Authority that your company is necessarily competent to undertake this service.
Submission of documents must conform to the details as contained within the Instructions for Tendering, and must arrive before 12:00 noon on 21 March 2017. (tenderers must note that a tender receipt timed at 12:00 noon or later will be classed as a late tender and will be rejected)
Any tender returned after this time will not be considered.
Should you require additional information, this may be obtained by submitting a request through the facility within the e.tendering portal not later than noon 7 days prior to the date of the tender submission.
In accordance with paragraph 1.4 of the “Instructions for Tendering”, listed below is a check list of what needs to be returned by yourself through the electronic tender system at https://procontract.due-north.com when submitting your tender. Failure to return these items will result in the tender not being considered.
1. Completed “Form of Tender” as attached.
2. Completed “Non – Collusive Tendering Certificate” as attached.
3. A full response to the “Method Statement” as attached.
4. A fully priced copy of the “Schedule of Prices” as attached.
Please note that the files are NOT on line forms, and in this respect tenderers are requested to copy all files (select file, click on right mouse button and save as target to tenderers location), prior to returning as individual forms.
It is important to allow sufficient time for your completed Tender and all supporting information to be received on the portal before the closing date and time. Failure to do so will result in your response being registered as a late submission and will not be accepted by the Authority.
Tenders which have commenced being uploaded before the closing time but have not finished being uploaded by the closing time will be registered by the system as a late submission.
Uploading files can take a lot longer than may be expected. It is the tenderer’s responsibility to ensure that sufficient time is allocated to the uploading of their Tender submission.
Unless specified images and graphics are not required as part of the Tender submission and if included may increase the amount of time taken to upload your submission onto the portal.
Key dates
Expression of interest window
From 01/03/2017 15:30 to 21/03/2017 12:00
New to ProContract?
If you are not currently registered on the ProContract procurement portal, you can complete a simple registration process by clicking the following link - Register free
Contact details
North Tyneside
Tyne and Wear
NE28 7RR
United Kingdom
