Cremyll View - Mount Edgcumbe Sea Wall Repairs
Main contract details
i) Mount Edgcumbe Quay
ii) Toll House Quay
iii) Lower Lodge Beach
iv) Garden Battery Beach
Cornwall Council, acting as Procurement Lead for the joint authorities, has commissioned the design of the works by Cormac Solutions Limited. The works are being funded by the joint authorities, with a funding application also having been made to the Environment Agency.
The Council seeks to appoint a suitable and demonstrably experienced Principal Contractor to undertake the rebuilding and repair works under an NEC 3 Engineering and Construction Contract 2013 Edition (Option C – Target Cost) with secondary options and Z clauses as included with the procurement documents. The works shall include vegetation removal, masonry repairs and repointing, reinstatement of scour damage, sprayed concrete repairs to masonry and at Mount Edgcumbe Quay, the rebuilding of a length of a mass concrete retaining wall with masonry facing. It is expected that the Contractor will need to design and install a temporary coffer dam to this last work area, the foot of which is below the mean low water level, in order to expedite the works.
It is anticipated that MMO approval will be received in January 2017, following which the contractor will be formally appointed and the Construction works will start as soon as possible thereafter with projected completion by May 2017. The sites are on publicly accessible open space and the foreshore, and are accessible by public highway, although access to Garden Battery Beach will require arrangement with the Mt Edgcumbe Estate. Toll House Quay will remain in use by the ferry operations to/from Plymouth, each day at various times, during the construction period.
PLEASE NOTE: To assist tenderers with preparing their submission, please note the date and time of 25/11 at 9am respectively as being advised as being an advantageously low tide time, to visit the site and when Project team personnel are aiming to be on hand to offer any practical advice and guidance to providers who might be able to visit on those specific occasions, otherwise contractors are at liberty to visit this publicly accessible site at any time at their own risk. Prospective Contractors are encouraged to visit the site to understand the site conditions, local constraints and access restrictions etc. Contractors should also be aware that Mount Edgcumbe Estate have requested that due to weekend events planned to take place at the country park on 9/4/17 and 27/5/17, the area for the small satellite contractors compound, to be located adjacent to Garden Battery Beach, will not be available for use on those particular dates.
Key dates
Expression of interest window
From 17/11/2016 15:00 to 16/12/2016 15:00