Refurbishment of Middle Chine Bridge and Alum Chine Footbridge
Main contract details
The deadline for submitting your response to this contract opportunity is 25th July 2016 at 14:00.
Suppliers interested in this opportunity should click on the ‘Register interest in this opportunity’ button in the top right of the screen. If you are not already logged into the system, you will be required to log in before you can ‘Register interest in this opportunity’. New users to the system must register first to obtain a user name and password before returning to this opportunity.
Once suppliers have registered their interest they can access the full tender documentation automatically from ‘My Activities’ on the home page. There is a guide for using the Supplying the South West system within the attachments section of this advert. Please follow the guide from page 36 on ‘How to Access Tender Documents through Supplying the South West’ within the attachments section to the right which provides a step-by-step screen shot of how to access the tender documents.
The documents shown within the attachments section of the advert are watermarked as Read-Only. These Read-Only documents should only be used to confirm if this is an opportunity that you wish to bid for and they are not a full list of all of the tender documents available.
Please do not complete these tender documents as they are Read-Only. To access the full tender documents, please click on the ‘Register interest in this opportunity’ button in the top right. As soon as you have done this, you will be able to access the full tender documents by following the guide ‘How to Access Tender Documents through Supplying the South West’.
The Council seeks Quotes to refurbish Middle Chine Bridge and Alum Chine Bridge.
The works to Middle Chine Bridge are as follows:
• To prepare areas of corroded steel and paint the whole of the bridge.
• Remove the hand rail and prepare and paint the localised areas of the parapet.
• Repair / replace areas of heavily corroded steel sections and bolts as instructed.
The works to Alum Chine Bridge are as follows:
• Lift the timber decking and mesh panels and remove to store
• To prepare areas of corroded steel and paint the whole bridge
• Paint mesh panels
• Replace the decking and mesh panels
The contract is due to start on the 22nd August 2016 and is expected to finish by the 14th October 2016.
Key dates
Expression of interest window
From 23/06/2016 12:00 to 25/07/2016 14:00
New to ProContract?
If you are not currently registered on the ProContract procurement portal, you can complete a simple registration process by clicking the following link - Register free
Contact details
Bournemouth
Dorset
BH2 6DY
United Kingdom
