Design & Build - Waterbeach Railway Station
Main contract details
Procurement activity includes the detailed design and construction of the scheme via appointment of a main Contractor under NEC Option A.
The scheme comprises a new railway station consisting of 2 No. platforms, accessible footbridge, and secondary means of escape (SME), a 200-space car park, taxi and bus drop-off, cycle storage, public realm, and a new access road from Cody Road. The new highway and car park will be operated and maintained by Cambridgeshire County Council.
The scheme also includes the decommissioning and demolition of the existing Waterbeach Railway Station.
It is proposed to transfer ownership, operation, and maintenance of the new station to Network Rail.
The current Station Facilities Operator (SFO) is Govia Thameslink Railway operating as Great Northern.
The Contractor will carry out the rail works as ‘Third Party Works,’ as defined in Standard NR/L2/CIV/095 and non-rail works as Outside Party works as defined in NR/L2/CIV/095.
The ES4 preliminary design has been completed by WSP as the Lead Designer and it is anticipated this will achieve the ‘Approved in Principle’ (AIP) milestone prior to the Invitation to Tender (ITT).
Sable Leigh Consultancy (SLC) are appointed as ‘Project Manager’ and Client Representative on behalf of the Greater Cambridge Partnership (GCP).
Volker Fitzpatrick has been undertaking Early Contractor Involvement (ECI) activities. The key outputs of the ECI work will be shared transparently as part of the tender pack.
Network Certification Body (NCB) has also been appointed in ES4 as the independent assessment body for CSM and interoperability.
The GCP are the delivery organisation for the Railway Station, however part of the funding is due to be provided by the developer of the wider Waterbeach New Town. Due to a delay in the legal agreement required between the GCP and the developer, GCP has taken the decision to delay the full ITT until November 2024. It should be made clear that the GCP is committed to delivery of the station and are confident that an agreement will be reached by November. However, it would not be appropriate to enter a full ITT until this is in place. The dates expected for the contract have been updated as appropriate, and the closing date for the SQ has now been moved back to Friday 23 August at 12 noon.
We have also taken the opportunity to review the requirements associated with company turnover, this has been reduced, and in line with a revised estimated Contract value for the Design and Construction now put at between £20m and £30m, we can confirm that we are reducing the requirement for bidders to demonstrate a turnover of £30m per annum.
Key dates
Expression of interest window
From 02/04/2024 09:00 to 23/08/2024 12:00