Provision of Independent Fire Risk Appraisals, Assessments and Ad-Hoc Technical Support 2017 - 2019 ...
Main contract details
Following completion of the initial phase of the programme, a main programme of FRA’s shall then commence and be completed within a 12 month time-scale from initial appointment. The assessments should identify the presence and extent of any fire risks within an individual property and be conducted in accordance with PAS79 and uploaded to Wigan and Leigh Homes’ ‘C365’ application, as detailed in the specification. This phase of the programme will consist of approximately 900 FRA’s to be completed within a twelve month period in accordance with the requirements of the Regulatory Reform Fire Safety Order (2005). These assessments shall be Type 3 FRAs unless information derived from the initial phase recommends that only Type 1 FRAs are needed. The assessment interval for this element of the programme shall be 1 yearly for high rise flats and schemes for vulnerable people; 2 yearly for sheltered units/schemes for older persons and 3 and above storey flats (excluding the high rise); and 4 yearly for 2 storey flats and other communal and workplace buildings.
The successful contractor must also be able to provide input at the design stage of any new build / extensive building alteration plans, to design out unnecessary fire risk and ensure Wigan and Leigh Homes’ fire safety standards can be achieved as well as legislative requirements, relevant guidance and British Standards. This should be followed up by an inspection at completion stage to ensure standards have been achieved. Type 3 FRA’s will then be required on handover of new-build projects or where existing buildings have been subjected to extensive alterations. The work will be ad-hoc and small in number and will be priced and instructed on an individual basis.
In addition, there may be a requirement to conduct destructive surveys (Type 4 FRA’s for flats only) on an ad-hoc basis or as part of the programme of communal areas. The need and format for such assessments will be discussed with the appointed consultant during mobilisation.
Interested organisations are directed to the Invitation to Tender documentation which details a full specification for this service.
The closing date of Friday 6th January 2017 at 17:00 represents the deadline for the receipt of final tender applications.
This Contract Notice was submitted for publication in the Official Journal of the European Union (OJEU) on 14th November 2016 and published with reference number 2016/S 221-402887. Subsequent to this, two Corrigendum Notices have been published with reference numbers 2016/S 223-406857 and 2016/S 245-448013.
Key dates
Expression of interest window
From 16/11/2016 09:00 to 06/01/2017 17:00
New to ProContract?
If you are not currently registered on the ProContract procurement portal, you can complete a simple registration process by clicking the following link - Register free
Contact details
Wigan
Greater Manchester
WN3 4HH
United Kingdom
