17303 Mersey Drive Extension and Refurbishment
Main contract details
a) The Contractor’s head office / local base must be located to enable emergency site attendance within one hour of request
b) Total turnover of the Contractor over the last two years must exceed £5,000,000.00
(where a contractor does not meet the required turnover, the contractor is to demonstrate their suitability to carry out the proposed scheme by listing all similar projects successfully completed in the last two years).
c) The Contractor must be able to demonstrate that similar projects have been completed successfully and provide satisfactory client side references relating to the similar projects.
d) The Contractor must be able to evidence an acceptable environmental policy.
e) The Contractor must be a member of the health & safety umbrella organisation “Safety Schemes In Procurement” (SSIP) eg CHAS
f) The contractor must carry Employer’s and Public Liability Insurance of a minimum £5,000,000
The following documents comprise this tender:
1) Document A – Tender Invitation Letter
2) Document B – Front Cover
3) Document C – Instructions to Tenderers
4) Document D – Preliminaries and General Conditions
5) Document E – NBS Document
6) Document F – Phase 1 – Pricing Document
7) Document G – Phase 2– Pricing Document
8) Document H – Phase 3– Pricing Document
9) Document I – External Works And Drainage– Pricing Document
10) Document J – Provisional Sums & Dayworks– Pricing Document
11) Document K – Main Summary
12) Document L – Form of Tender
13) Document M – List of Tender Drawings
14) Document N – PCID
15) Document O – Form of Bond
16) Document P – Architect’s Drawings (listed below)
17) Document Q – Structural Engineer’s Drawings (listed below)
18) Document R – Mechanical & Electrical Drawings & Specifications
19) Document S – Asbestos Survey
20) Document T – Designers Risk Assessment
21) Document U – SWMP
22) Document V – 29752LG – Mersey Drive Phase II Datasheet report
23) Document W – Contract Amendments
24) Document X – School Holiday List
25) Document Y - Contractor Questionnaire
26) Document Y1 – GMCA Social Value Policy Nov 2014
27) Document Z – Legionella Management Report
Tenderers may propose additional subcontractors to the names listed within the tender documents no later than 24 August 2018. The Contract Administrator will confirm any approval(s) via The Chest in an open notification to all contractors who register an interest in the tender
Tenderers should note that the tender sum must include for all named products, materials and specialist named sub contractors included on the Drawings and within the Specifications. Where tenderers wish to propose alternative products / sub contractors to those named, the proposals should be included at the appropriate location in the form of tender appendix but not within the tender sum.
The completed Form of Tender and Appendices (Document L) together with the Priced Document Summary (Documents K) is the only tender submission to be returned and shall only be sent electronically via The Chest. Your tender submission must be made no later than noon on 7 September 2018, and must not be made by any other method.
Where the submitted tender is under consideration, the Contractor shall provide the following fully completed documents within 3 days of a request so to do.
Priced Documents F to J inclusive
Key dates
Expression of interest window
From 09/08/2018 14:32 to 03/09/2018 14:32