Top Deck Waterproofing Renewal at Avenue Road Multi-Storey Car Park
Main contract details
The deadline for submitting your response to this contract opportunity is 5 February 2018 at 14:00.
Suppliers interested in this opportunity should click on the ‘Register interest in this opportunity’ button in the top right of the screen. If you are not already logged into the system, you will be required to log in before you can ‘Register interest in this opportunity’. New users to the system must register first to obtain a user name and password before returning to this opportunity.
Once suppliers have registered their interest they can access the full tender documentation automatically from ‘My Activities’ on the home page. There is a guide for using the Supplying the South West system within the attachments section of this advert. Please follow the guide from page 34 on ‘How to Access Tender Documents through Supplying the South West’ within the attachments section to the right which provides a step-by-step screen shot of how to access the tender documents.
Avenue Road Multi-Story Car Park is a busy town centre multi-storey car park on five levels. It comprises two sections, built at different times and connected together by access ramps.
The waterproofing and wearing layers to the top deck of one section is life expired and is failing. The area has been patched but is now in a condition that complete removal, preparation and renewal is required.
It is proposed to use a 'Polymethyl Methacrylate' (PMMA) based system, applied in one operation using products supplied as a complete system by a single manufacturer in accordance with the performance specification detailed in Section 2 of the Specification.
Whichever system is used, it will be applied by a contractor trained and approved by the system manufacturer so as to receive an insurance backed manufacturer’s warranty of no less than ten years.
The successful supplier will be expected to commence the works on 26 February 2018. The supplier will be required to ensure the works are completed by 6 April 2018. Final dates to be confirmed.
Key dates
Expression of interest window
From 02/01/2018 09:30 to 05/02/2018 14:00
New to ProContract?
If you are not currently registered on the ProContract procurement portal, you can complete a simple registration process by clicking the following link - Register free
Contact details
Bournemouth
Dorset
BH2 6DY
United Kingdom