Aston Clinton Traffic Calming Construction Works
Main contract details
- footway reconstruction 170mm depth
- footway resurfacing 70mm depth
- new PCC edging
- granite kerb lift and relay
- surface water drainage (including replacing a section of main carrier pipe and installation of gullies with new connections)
- new road markings and traffic signs
- pedestrian dropped kerbing
- supply and maintain traffic management
- night work with road closure & local diversions for carriageway resurfacing
- 2 No carriageway raised tables with street imprint coloured texture surfacing and 4 no carriageway street imprint coloured texture surfacing sites
- topsoil and seed
- 50mm depth patch in front of kerbing
Further information will be provided on the measurement of the above items with the tender pack during the tender process.
Constraints:
- London Road is a busy route with an average of 12,000 vehicles per day, the traffic calming and drainage measures are located in and around the village hub. The footway work is located along London Road from approximately Green End Street to Lower Icknield Way. Restricted hours will apply and permissible working times are 9am – 3pm and any temporary traffic lights must be manually controlled at peak times.
- Indicative construction programme to be between March – June 2024.
We are intending to run an open tender process via the Pro Contract portal in early December 2023. If you are interested in providing a quote and have resource to complete this work by June 2024 please let us know and will arrange for you to receive a further notification once the tender package is live on the portal.
The tender package will include a full set of drawings with Bill of Quantities along with PCI, (Pre Construction Information documents). Please can you advise if you are interested and have the necessary resource available to undertake this work by responding and expressing your interest no later than midday on Wednesday 29 November 2023. See attached the General Arrangement plans of the overall scheme, highlighting the extents of the scheme for your initial review.
Atkins Realis have been commissioned to act as Principal Designer, Project Manager and Supervisor to undertake various highway works along London Road, Aston Clinton, Buckinghamshire. Your company will be required to act as Principal Contractor for the works delivery.
Key dates
Expression of interest window
From 23/11/2023 12:00 to 29/11/2023 23:30