Construction of Beach Lodges for Manor Steps Phase Two
Main contract details
The deadline for submitting your response to this contract opportunity is 4 June 2018 at 14:00.
Suppliers interested in this opportunity should click on the ‘Register interest in this opportunity’ button in the top right of the screen. If you are not already logged into the system, you will be required to log in before you can ‘Register interest in this opportunity’. New users to the system must register first to obtain a user name and password before returning to this opportunity.
Once suppliers have registered their interest they can access the full tender documentation automatically from ‘My Activities’ on the home page. There is a guide for using the Supplying the South West system within the attachments section of this advert. Please follow the guide from page 34 on ‘How to Access Tender Documents through Supplying the South West’ within the attachments section to the right which provides a step-by-step screen shot of how to access the tender documents.
Bournemouth Borough Council is seeking to appoint a contractor to construct 10 Beach Lodges (including 1 as an office) as part of the Phase 2 Manor Steps project. Manor Steps is situated 800 metres east of Boscombe Pier. Accessible via Boscombe Pier, or a short stroll down the cliff zig-zag path from Boscombe Overcliff Drive.
The Beach Lodges will be an addition to the 15 lodges that are already onsite and fully operational. The initial 15 lodges (Phase 1) have been in operation since April 2017 and since opening have been hugely popular, for much of summer 2017 they operated at 100% capacity.
The Council require a contractor to build the ten beach lodges offsite as per specification, and to install by February 2019. All groundworks will be completed by a separate contractor. The construction will include the internal fit out of the beach lodges. Infrastructure for utilities (water and electricity) is already onsite, and will require connection once the beach lodges are in place. To ensure consistency and to aid with ongoing maintenance, the Phase 2 beach lodges are expected to be to the same specification as the Phase 1 beach lodges.
Key dates
Expression of interest window
From 02/03/2018 15:00 to 04/06/2018 14:00
New to ProContract?
If you are not currently registered on the ProContract procurement portal, you can complete a simple registration process by clicking the following link - Register free
Contact details
Bournemouth
Dorset
BH2 6DY
United Kingdom