Homes England - GCN Mitigation Works & Vegetation Clearance - Lighthorne Heath
Main contract details
<p> </p>
<p>• Review design details pertaining to the Works; ecological fencing, habitat ponds, planting schedule and the like (see the various Annexes referencing to Annexes 3-15 inclusive) .</p>
<p>• Attend a start-up meeting.</p>
<p>• Provide machinery and workforce to clear vegetation in the agreed location for the S278 works along the B4100. (see Annex 7)</p>
<p>• Provide machinery and workforce to clear vegetation in the agreed location for the newt habitat creation and fenceline (see Annex 10).</p>
<p>• Supply materials, plant, equipment and workforce to install pitfall trapping and carpet tiles (see Annex 11).</p>
<p>• Supply materials, plant, equipment and workforce to install ecological fencing: semi-permanent great crested newt fencing and temporary amphibian fencing (see Annex 11). Part of the newt capture area along the B4100 was installed and completed in Autumn 2021 Annex 11 shows the lengths of fencing still to be installed with dashed lines the solid lines are complete.</p>
<p>• Carry out maintenance checks and repairs to fencing during the works.</p>
<p>• Supply materials, plant, equipment and workforce to install 4nr amphibian hibernacula (see Annex 12).</p>
<p>• Supply materials, plant, equipment and workforce to install 4nr newt ponds, including emergent and aquatic planting (see Annexes 5, 6, 8 and 9).</p>
<p>• Excavated material to be removed and bunded in the adjacent development area.</p>
<p>• Supply materials, plant, equipment and workforce to install the habitat creation: post and wire fencing around the natural regeneration area of the woodland (see Annex 6 and 13), including overseeding and tree, woodland, shrub planting as per the planting schedule (see Annex 6,13 and 14).</p>
<p>• Supply materials, plant, equipment and workforce to install tree protection fencing; followed by removal once the pond works have been completed (see Annex 15).</p>
<p>• Provide a maintenance schedule for the habitat areas, maintenance of the newt fencing and guarantee to replant failing vegetation/trees for the first five years; including site visits. This should include for a clause to exit the maintenance agreement early.</p>
<p>• Provide an option cost for subsequent years of management/maintenance on an annual basis.</p>
<p>• Supply of welfare provision (as required).</p>
<p> </p>
<p>All works will be co-ordinated with EDP’s ecologist to ensure adequate ecological supervision at all stages of the works. EDP will provide monitoring during the exclusion period. The Contractor is to provide an outline programme as part of the tender return. This should be optimised to minimise the time on site but should be targeted to ensure that vegetation clearance is completed prior to the next bird nesting season and aligned with the next available period for erection of the remaining newt fencing as early as possible within the next appropriate window. The various works are set out in more detail within the table at Annex 9. This table provides lengths and areas of clearance required, amounts and types fencing that will be required and the scope of the habitat creation. If further clarification then this can be sort from EDP. We will expect all works to be undertaken within normal working hours (Monday to Friday 0800 to 1800 hours Monday to Friday). The contractor will also need to liaise with Homes England to arrange access. Homes England will also need to produce RAMs prior to undertaking works on site.</p>
Key dates
Expression of interest window
From 19/11/2021 14:00 to 15/12/2021 12:00