4.1.2 – RENDER The external main façade of the Cinema is made of three different volumes, which includes a taller central body, where the main entrance to the building is located, and two lower ones, on each side. These facades are finished in render, painted white. There is another small section of the south façade, comprising the depth of the Victoria Pub building, which follows the same finish. The condition of the finishes are relatively poor, with some areas of loss, staining and previous patchy repairs. The ground floor will be subject to considerable renovation as part of the works, but the intention is for the areas above to be retained and repaired, as especially the window openings are particularly significant. Most importantly, the lost pediment on the top of the entrance volume is proposed to be reinstated following the well documented design through historic images. This element was lost following the bombing of the building during WWII, so it is assumed considerable repairs were carried out afterwards to the entire façade. It is unclear whether there are areas of surviving original render, or if complete replacement was carried out. In any case the significance lies more on the overall aspect of the façade rather than the composition of the render mixture. The proposals are for retaining as much of the render as possible, and as such, understanding what is currently in place is required prior to finalising the composition of the materials to be introduced. It is recommended that a few samples are taken from selected areas and analysed. The proposed render should have either a similar composition or performance, as well as thickness/coats, finished texture, etc, so that in time differences in the façade are avoided. These locations can be agreed on site, but it would be advisable to select an area of the existing pediment (which would reflect the works carried out post-war) but also around windows and in other areas of the façade where disruption is less likely to have taken place in the past. From photographic evidence it is assumed the wall was originally painted white or of a light colour, and as such a paint analysis exercise would also be relevant. Assessment and preparation of these surfaces prior to the works would follow and initial cleaning and potential paint removal, so that the substrate is as stable and even as possible. The extent of the repairs can be then agreed following a condition survey of this façade. Visual inspection from the ground has allowed for the identification of some defects, which are described below. Defect 1 – Cracks Render defects that have a crack like appearance could have different origins and could even relate to structural problems or movement in the substrate. In these cases, surface repairs might not be enough to overcome the problem, and should concerns be raised over such defects, a structural assessment should be carried out prior to repairs. In the majority of the cases, though, these can be repaired locally, as long as the render is in fair condition and stabilized. Very fine hairline cracks in painted surfaces will probably disappear with the application of the new finishes, as traditionally you would apply several coats of limewash. Cracks which are wider than 0.5mm, but not accompanied by detachment, may be surface filled. Externally, the use of a colour-matched fine grained lime mortar, slightly weaker than the surrounding material, is most suitable. Existing cracks may need to be opened out towards the back by scraping with a knife or spatula to form a parallel sided crack, in order to improve the key for repair. Loose material should be removed and the surface dampened down, unless using a proprietary filler, in which case the surface must be dry. New mortar should be pushed firmly into the back of the crack using appropriate tools, and letting it protrude slightly from the surface, which after curing can be textured back by scraping or tamping. Whilst curing, the repairs need to be kept damp and protected from wind and sunshine. Defect 2 – Loss, delamination or detachment Where cracking is due to inadequate keying of the substrate or differential movement underneath, bridging with a mesh can provide additional adhesion and dissipate localised stress. Ordinary stainless steel and galvanised steel wire mesh are not suitable for lime renders as they have very different thermal properties and are so smooth that lime mortars cannot adhere firmly. The best materials are non-metallic meshes from alkali-resistant mineral fibres or stainless steel wire mesh, such as brick mesh, brick lath or clay lath. The method of surface repair will depend on whether loss is restricted to the finishing coat or extends into the lower layers. As for the other repairs, the reinstated material should ideally be slightly more porous and lower flexural strength, whilst being a close match as much as possible. Appropriate tools should be used to cut back the areas of damage carefully, avoiding the risk to lose adjacent material in fair condition. Small irregular areas can often be patched successfully with minimal visual impact, especially when painted over. Depending on the case it could be useful to cut back to adjacent elements such as window openings, string course, etc, in order to achieve a better finish. Ideally, the remaining surrounding render should be firmly adhered to the backing. The application of the repair should follow the same guidelines described for Defect type 1. Large areas of detachment have not been identified from visual inspection from ground level. However, mechanical means of retaining the render in place could be considered, if there is a preference for salvaging the material. If the decision is made for removal of large areas of render, due recording of materiality and condition should be carried out prior to removing. Defect 3 – Soiling/staining Given the intention to re-paint the façade, existing staining defects will be less of a concern. Preparation of the surfaces could encompass the removal of the existing paint, once analysis has been carried out, in order to obtain a better finish. Trials should be carried out for cleaning and paint removal in order to assess the best methodology. Gentler methods should be tested first, such as dry brushes with soft bristles or low pressure heated water jets, which need to be carefully controlled. It is not expected that more abrasive/mechanical methods, such as scraping and/or picking with spatulas and scalpels, will need to be used, but could be considered after further assessment. 4.1.3 – WINDOWS The main façade windows located on the first floor of the building are of high significance, given that they should be original – whereas other areas have been significantly altered, particularly at ground level. No evidence has been found of replacement post-war, although this is a possibility given the damages and repairs carried out at the time. Some of these windows have been boarded up and are in a particular state of disrepair, having also suffered a considerable number of alterations (glazing panels, locks, finishes, etc). They are, however, a notable element of the building and an effort should be made towards retention. Expected thermal performance improvements to the building directly impact the proposed works to the windows. Initial proposals were for full replacement throughout, but it is expected that such route is duly accompanied by a thorough report on the options considered for retention, and why (if) this is not a possibility. As it stands, the option for retention is still a consideration. An initial condition report was prepared by WDI, which has been attached as an Appendix to this document. Specialist involvement will be required in order to consider whether the condition of the frames is salvageable (once all the layers of paint have been analysed and removed) as well as options for improving its thermal performance by replacing the glass panels – products such as Histoglass should be considered as are single glaze but can achieve lower U values. Secondary glazing options are less desirable as will have some visual impact internally but might still be preferable to full replacement, but further discussions following specialist receipt of specialist advice will need to take place with the local authority and HE. Most mild steel windows from the interwar period were not galvanized and as such susceptible to rust – evidence of this is found in the preliminary condition report. The most common form of surface protection given to steel was the application of paint, and from observation overpainting is evident, probably as a way to repair damages and degradation by weather and light. Paint analysis is recommended to assess the nature of these finishes and whether evidence of original materials can be found. If present, original coatings should be preserved, although this might prove challenging or economically unviable. Cleaning methods suitable for mild steel must be selected in order to provide a stable surface to which new paint application can adhere – the use of hand and power tools, together with washing treatments are probably most suitable. Cleaned metal should be primed with a rust inhibitor immediately after, to avoid reformation of rust on the cleaned and exposed surfaces. Careful repainting, incorporating a system of primer, mid and top coats, should be carried out, upon advice of specialist contractor. Paint coating usually require re-application within 7-10 years, subject to manufacturer’s recommendations and depending on quality, application method, and the surrounding environment. If required, repairs will require using the correct alloys and equipment and should only be undertaken by qualified and experienced operatives. Although mild steel alloys are still readily available, the original standardized sections common to all manufactures of the interwar period are no longer in production. Repairs that require the splicing in of new metal are therefore reliant on the availability of salvaged sound material or the fabrication of new which match the original sections. If these windows end up being removed and replaced with new, a proper disposal strategy should be prepared and carried out as some of the material could be salvaged for other uses. Trial samples of paint stripping, repair techniques and cleaning methods should be undertaken and recorded, including strength and dwell time and conditions for stripping cleaning, in order for proper replication once the most suitable and effective method has been agreed.
Description of the geographical coverage:
Former EMD Cinema Walthamstow E17 4QH London
Reference no:
DN522521
Estimated total value:
£8,000.00
Estimated annual value:
£0.00
VAT not recovered:
£0.00
Participating organisations:
N/A
Keywords:
N/A
Start date:
03/03/2021
End date:
06/05/2022
Awarded date:
14/02/2021
Awarded value:
£7,575.00
Appraisal date:
01/05/2021
Review date:
31/05/2021
Initial contract period:
15 months
Total option to extend:
Total contract period:
15 months
Available extensions:
0 with 0 taken
Central purchasing body:
London Borough of Waltham Forest
Framework:
N/A
Find a Tender (FTS):
No
Process used:
RFQ

Primary contact

Title:
-
First name:
Maria
Surname:
Sommer
Email address:
Maria.Sommer@walthamforest.gov.uk
Telephone number:
020 8496 3554
Fax number:
Mobile number:

Awarded supplier(s)

Company name Company reg number SME/VCS VCS reg number Contacts Postcode
Purcell 0315259OC
  • - Ms Amelia Sissons
SE1 3UN
Show more

Categories

  • 45454100-5 - Restoration work
Show more

Notes

Public notes:

Custom details

Public attachments

help Public attachments can be viewed by all users (buyer, supplier or visitor)

No attachments

  • Cookie policy
  • Terms and Conditions
  • Privacy
  • Accessibility
  • Help Center

Version

Your session is about to expire in

Please use the button below to continue working

Loading...

At Proactis we value your privacy

We use essential cookies to make our website work. We’d also like to set optional cookies to provide you with the best experience and help us to improve the site.

If you are happy with this, please select "Accept all". Further information on the individual cookies we use, their purposes and to easily manage these, please click "Manage options".

Cookie Policy   |   Privacy policy

Cookie Policy

To make this site work properly, we sometimes place small data files called cookies on your device. Most big websites do this too.

What are cookies?

A cookie is a small text file that a website saves on your computer or mobile device when you visit the site. It enables the website to remember your actions and preferences (such as login, language, font size and other display preferences) over a period of time, so you don't have to keep re-entering them whenever you come back to the site or browse from one page to another.

How do we use cookies?

A number of our pages use cookies, for example to remember:

  • Your display preferences, such as contrast colour settings or font size
  • If you have agreed (or not) to our use of cookies on this site

Enabling these cookies is not strictly necessary for the website to work but it will provide you with a better browsing experience. You can delete or block these cookies, but if you do that, some features of this site may not work as intended.

Please see the table below for more information on what cookies are used on this site and their purpose:

Category of use Description
Session and persistent cookies Similar to most websites, we use 'session cookies'. These cookies only exist for the length of time that you visit our site and are are deleted once you close the browser. We also use 'permanent cookies' known as 'persistent cookies' which remain stored on your browser ready for use the next time you visit our website.
Authentication We use cookies to help us show you the right information and personalise your experience when you’re logged in.
Security We use cookies to enable and support our security features, and to help us detect malicious activity and violations of our Website Terms and Conditions.
Preferences, features and services Cookies can help you fill out forms on our site quicker. They also allow us to recognise if you’ve contacted us before – for example through our Live Chat. You can learn more in our Privacy Policy.
Performance, Analytics and Research Cookies help us learn when you access our site from other websites, applications, or devices such as your work computer or your mobile device.

How to control cookies

You can control and/or delete cookies as you wish - for details, see below. You can delete all cookies that are already on your computer and you can set most browsers to prevent them from being placed. If you do this, however, you may have to manually adjust some preferences every time you visit a site and some services and functionalities may not work.
AllAboutCookies.org

At Proactis we value your privacy

We use essential cookies to make our website work. We’d also like to set optional cookies to provide you with the best experience and help us to improve the site.

Details of the essential and non-essential cookies we use are provided. You can confirm your consent preference for non-essential cookies using the toggles within the table.

Essential cookies


Name Type Description Expiry
.ASPXAUTH Session Cookie These cookies are used when authenticating your access to ProContract. End of Session
__RequestVerificationToken Session Cookie This cookie is used to prevent Cross Site Request Forgery (CSRF) attacks. This is a is a type of malicious exploit of a website where unauthorised commands are transmitted from a user that the web application trusts. End of Session
ASP.NET_SessionId Session Cookie This cookie is used to identify your user session. This cookie allows our web servers to respond to your actions on the website such as "Expressing interest in opportunities" or browsing the website. The website wouldn't work for you without it End of Session
ContractRegister_Org_PortalId Session Cookie These cookies are used to store and recall information when searching/using the ProContract Contracts Register. End of Session
ContractRegister_Portal_PortalId Session Cookie These cookies are used to store and recall information when searching/using the ProContract Contracts Register. End of Session
Opportunity_Org_PortalId Session Cookie These cookies are used to store and recall information when searching/using the ProContract advertised opportunity portal. End of Session
Opportunity_Portal_PortalId Session Cookie These cookies are used to store and recall information when searching/using the ProContract advertised opportunity portal. End of Session

Non-Essential Cookies


Name Description On/Off
Application Insights

This is a service provided by Microsoft which collects data to allow us to monitor the health and status of the web application.

GoogleAnalytics

These cookies are used to track and store anonymised user usage. Please click here for further information.;